Introducing a truly professional WordPress theme built to last! We developed Wilmër for all construction & architecture sites.
Location | Duration | Completed |
---|---|---|
RYDE, NSW | 14 weeks | 2019 |
To enhance the safety of road users and minimize head-on collision, medium performance barrier like Elsholz Kerb was required. The works include construction cast-in-situ nonstandard profile of Single Side Kerb and Double Side Median Elsholz. All works must be completed under ROL and the road must be open safely to the public every morning.