Location | Client | Duration |
---|---|---|
Artarman, NSW | Ausgrid | 08 Weeks |
Main Contractor | Completed | |
---|---|---|
Zinfra | 2020 |
Installation of new conduits to connect exiting distribution panels with an external pit to accommodate future supply needs. The scope of works include excavation works using nondestructive methods, installation of new 150mm conduits, connection pits, backfill the area with TSB, install protection bollards and permanent restoration of area.